Breaking News:
Programat EP 3010/G2 110-120V/50-60Hz -- " The Programat G2 Furnaces have a modern design, intuitive operation and a ..." -- 17 April 2022
Programat EP 5010/G2 110-120V/50-60Hz -- " The Programat G2 Furnaces have a modern design, intuitive operation and a high ..." -- 17 April 2022
Programat P510/G2 110-120V/50-60Hz -- " The Programat G2 Furnaces have a modern design, intuitive operation and a high ..." -- 17 April 2022
Programat P710 -- " The Programat® P710 leads ceramic furnaces into the future with its unique cutting ..." -- 05 October 2015
Programat P710/G2 110-120V/50-60Hz -- "   The Programat G2 Furnaces have a modern design, intuitive operation and a ..." -- 17 April 2022
The Programat G2 Furnaces have a modern design, »
The Programat G2 Furnaces have a modern design, »
  The Programat G2 Furnaces have a modern »
The Programat G2 Furnaces have a modern design, »
The Programat® P710 leads ceramic furnaces into the »
2557237
Today
Yesterday
This Week
Last Week
This Month
Last Month
All days
303
726
4334
2209531
17419
16786
2557237

Your IP: 172.70.126.201
2024-04-20 15:42

free counters

 

188352 intro at image

Article number: 4100346
Model base production kit for effective formation of model bases for plaster arches.
 
188352 dia zoom at image ANWEND 006-a-1
188352 dia zoom at image ANWEND 006-a-2
Two-stage model base production
1. Primary base:
  • a base is made for the isolated plaster arch complete with pins.
  • base former available in three different heights suitable for almost all the most popular pins.
  • exact positioning of metallic retention discs.
188352 dia zoom at image ANWEND 006-b-1
188352 dia zoom at image ANWEND 006-a-2
 
2. Secondary base:
  • the base plate of the base is removed.
  • the plaster base is isolated.
  • the magnet is positioned along with the magnet holder.
  • the secondary base is filled with plaster.
Before separating both bases they should be trimmed to the required size.
188352 dia zoom at image ANWEND 006-C-1
188352 dia zoom at image ANWEND 006-c-2
Advantages
  • simple system for base formation with mainly reusable parts.
  • less plaster is needed.
  • precision fit of primary and secondary base with Split-Cast system.
  • after positioning in the articulator the model can be easily removed and precisely repositioned.
  • base heights suitable for all Renfert Bi-Pins, the Smart-Pin and the most modern pin systems with guide length of 12.5 mm, 13.5 mm and 17.5 mm.
  • two sizes available – for small and large jaws.
  • retentive discs and magnet holders.
188352 dia zoom at image PROD 001  
 
 
 

 

  • Prev
  • Our Valued Partners
Scroll to top